A4 Via Solutions Thüringen

Holding:

50%

End of contract (year):

2037

Length:

45 km

VINCI Concessions acquired the concession contract for the A4 Horselberg motorway in 2007 for a period of 30 years through its subsidiary, Via Solutions Thüringen GmbH & CO, in which VINCI Concessions Deutschland GmbH holds a 50% stake.

The contract covers the design, construction, renovation (widening), financing, operation and maintenance of a 45‑km stretch of motorway in the state of Thuringia.

Also to discover

A5 Via Solutions Südwest

VINCI Concessions acquired the concession contract for a 60-km stretch of the A5 Malsch-Offenburg motorway in 2009 for a ...

See the infrastructure